
作者:中国铁路总公司组织编译
页数:27页
出版社:中国铁道出版社
出版日期:2017
ISBN:9787113226640
电子书格式:pdf/epub/txt
内容简介
This Code consists of nine chapters:General Provisions; Terms; Basic Requirements; Choice of Delivery-receiving Modes;Number of Industrial Stations and Harbour Stations and Site Selection; Layout Plans; Junction Location9 Delivery-receiving Location and Major Equipment Layout; Number and Effective Lengths of Station Tracks; Carrying Capacity and Marshalling Capacity of Station.
The major revisions in this code are:revision of design year of industrial station and harbour station,and setup of rail weighing bridge; addition of articles for delivery-receiving modes and station layout to facilitate direct traffic between CR network and industrial siding; revision of some articles and their explanations.
All relevant organizations are kindly requested to sum up experience and collect materials in the implementation of this Code. In case of any corrections or supplements needed,please send the suggestions to the Third Railway Survey and Design Institute Group Corporation (No.l0 Zhongshan Road, Tianjin 300142, China), and submit copies to China Railway Economic and Planning Research Institute (No. 29B,Beifengwo Road,Haidian District 9 Beijing 100038 9 China) for reference of future revisions.
Construction Management Department of CHINA RAILWAY is responsible for the interpretation of this Code.
目录
2 Terms
3 Basic Requirements
3.1 Types of Industrial stations and Harbour stations
3.2 Design Principles of Industrial stations and Harbour stations
4 Choice of Delivery-receiving Modes
5 Number of Industrial Stations and Harbour Stations and Site Selection
5.1Number of Industrial Stations and Harbour Stations
5.2 Site Selection
6 Layout Plans
6.1 GeneralRequirements
6.2 Type I Layout Plans
6.3 TypeIILayoutPlans
6.4 Type m LayoutPlans
6.5 TypeIV LayoutPlans
7 Junction Location,Delivery-receiving Location and Major Equipment Layout
7.1 Locationofjunctions
7.2 Delivery-receiving Location
7.3 Passenger and Freight Transport Facility and Shunting Equipment
7.4 RailWeighingBridge
7.5 Tippler Ground
7.6 Loop Track Layout and Technical Standards
8 Number and Effective Lengths of Station Tracks
8.1 Number and Effective Lengths of Receiving-Departure Tracks
8.2 Number and Effective Lengths of Shunting Tracks (Marshalling-Departure Tracks)
8.3 Number and Effective Lengths of Shunting Necks
8.4 Number and Effective Lengths of Delivery-receiving Tracks
9 Carrying Capacity and Marshalling Capacity of Station
Words Used for Different Degrees of Strictness















