内容简介
根据《国家能源局关于下达2015年能源领域行业标准制(修)订计划的通知》(国能科技〔2015〕283号)的要求,规范编制组经广泛调查研究,认真总结实践经验,参考有关国内外先进标准,并在广泛征求意见的基础上,修订本规范。本规范的主要技术内容是:总则、术语、拱坝布置、坝体混凝土、作用与作用组合、拱坝应力分析、拱座抗滑稳定分析、整体稳定分析、拱坝抗震设计、坝基处理、坝体构造、温度控制与防裂设计、泄水建筑物及消能防冲、安全监测设计、施工要求、初期蓄水与运行维护。
作者简介
国家能源局负责研究拟订国家能源发展战略,审议能源安全和能源发展中的重大问题,统筹协调国内能源开发和能源国际合作的重大事项。
目录
1 General Provisions
2 Terms and Symbols
2.1 Terms
2.2 Symbols
3 Basic Requirements
4 Project Layout and Dam Zoning
4.1 Project Layout
4.2 Dam Crest
4.3 Dam Slope
4.4 Dam Zoning
5 Filling Materials and Filling Criteria
5.1 Filling Materials Investigation, Testing and Quarry Planning
5.2 Cushion Materials and Transition Materials
5.3 Rockfill Materials
5.4 Filling Criteria
6 Plinth
6.1 Alignment and Layout of Plinth
6.2 Plinth Size
6.3 Toe Wall
6.4 Concrete and Reinforcement of Plinth and Toe Wall
7 Face Slab
7.1 Face Slab Jointing
7.2 Face Slab Thickness
7.3 Face Slab Concrete
7.4 Reinforcement Arrangement
7.5 Crack Control Measures for Face Slab
8 Joints and Waterstops
8.1 General Requirements
8.2 Perimeter Joints
8.3 Vertical Joints
8.4 Other Joints
8.5 Joint Filling and Waterstop Materials
9 Foundation Treatment
9.1 Excavation of Foundation and Abutments
9.2 Treatment of Foundation Defects
10 Analysis and Calculation
10.1 Seepage Analysis
10.2 Sliding Stability Analysis
10.3 Stress and Deformation Analysis
11 Seismic Measures
12 Staged Construction and Dam Heightening
12.1 Staged Construction
12.2 Temporary Water Retaining
12.3 Embankment Protection Under Overflow Condition
12.4 Dam Heightening
13 Safety Monitoring
14 Construction Requirements
15 Initiallmpoundment, Operation and Maintenance
Explanation of Wording in This Code
List of Quoted Standards
2 Terms and Symbols
2.1 Terms
2.2 Symbols
3 Basic Requirements
4 Project Layout and Dam Zoning
4.1 Project Layout
4.2 Dam Crest
4.3 Dam Slope
4.4 Dam Zoning
5 Filling Materials and Filling Criteria
5.1 Filling Materials Investigation, Testing and Quarry Planning
5.2 Cushion Materials and Transition Materials
5.3 Rockfill Materials
5.4 Filling Criteria
6 Plinth
6.1 Alignment and Layout of Plinth
6.2 Plinth Size
6.3 Toe Wall
6.4 Concrete and Reinforcement of Plinth and Toe Wall
7 Face Slab
7.1 Face Slab Jointing
7.2 Face Slab Thickness
7.3 Face Slab Concrete
7.4 Reinforcement Arrangement
7.5 Crack Control Measures for Face Slab
8 Joints and Waterstops
8.1 General Requirements
8.2 Perimeter Joints
8.3 Vertical Joints
8.4 Other Joints
8.5 Joint Filling and Waterstop Materials
9 Foundation Treatment
9.1 Excavation of Foundation and Abutments
9.2 Treatment of Foundation Defects
10 Analysis and Calculation
10.1 Seepage Analysis
10.2 Sliding Stability Analysis
10.3 Stress and Deformation Analysis
11 Seismic Measures
12 Staged Construction and Dam Heightening
12.1 Staged Construction
12.2 Temporary Water Retaining
12.3 Embankment Protection Under Overflow Condition
12.4 Dam Heightening
13 Safety Monitoring
14 Construction Requirements
15 Initiallmpoundment, Operation and Maintenance
Explanation of Wording in This Code
List of Quoted Standards